Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: added placeholder for Renesas company demo

...

The idea was raised to have booked demo time slots.  Schedule will be arranged.

TimeVisiting Individual/CompanyResponsible staff
xxx-yyy

xxx-yyy



Demos will likely fall into 3 categories:

...

  1. Key Features and Goals

    Feature demo, highlight some principles and goals and relationship to GENIVI as a whole.
    Chromium features.

  2. Software Development Environment (SDE)

    What is the SDE environment and what is it like to develop on GDP?
    How is the SDE built using pipelines on go.genivi.org?

  3. Software Over-The-Air Updates

    Show the interaction with the SOTA server, and downloading to a target.

  4. (warning) Vehicle Signals End-to-end

    Details to be defined

  5. (warning) Navigation / Fuel Stop Advisor

    Details to be defined

  6. Car Data Logging

    Details to be defined

  7. Smart Device Link

    Details to be defined

  8. Renesas R-Car Gen 3
    Demonstration of Renesas's involvement in the GDP project. Details to be defined.
  9. Company Demo #1

  10. Company Demo #2

  11. Company Demo #3 ...

...

Our floor layout with tables, etc: TODO (warning)


Hardware plans

What

Count

Responsible

Plan Confirmed

Notes

What6Who Who (tick) (warning)

Detailed description.  Includes X, Y and Z

Networks

What

Count

Responsible

Plan Confirmed

Notes

Network Switch (100 MBps)6Nicholas Contino

One per topic station, interconnected

Network cables, short~25"

Network cables, long

5

"

Electrical


What

Count

Responsible

Plan Confirmed

Notes

Electrical extension to each station (outlet type?)According to floor plan.


EU and US to XXX Converters?10




Multi-plug extension cords
(US outlets)





Can avoid converters on each device (instead plug an extension into a single converter).

Because some of the diverse hardware will use US/EU transformers.

Multi-plug extension cords
(EU outlets)



same as above





Software Preparation



Topic

Needed preparation

Responsible

Plan Confirmed

Notes

Key Features and Goals

Standard GDP-13 or GDP-Master build, (for R-Car Starter kit).

The same on Intel (TBC).




Software Over-The-Air Updates
SOTA Demo = Server-setup, account, example package to update,
list key presentation points



Software Development Environment (SDE)
SDE Demo.  Standard PC + VirtualBox connected to Television.

Gunnar.



Vehicle Signals  Demo 



Awaiting confirmation that software will be finished.

... continue with all decided demos




Tables, Chairs, Printed Material, Other...

 What

Count

Responsible

Confirmed

Notes

Tables10Provide requirements to Karin
According to layout


Staffing

For clarity, strive to down both "GENIVI staff" and each contributing company's staff here for a complete overview.


Day

 Opening Hours

Who

Email

Phone

Notes

Tuexxx - yyyJohn Doe #1


Tue
Jane Doe #2


Wedxxx-yyy



Wed