JOIN/SIGN UP
Already a Member? |
GET INVOLVED
Understanding and Engaging in COVESA Expert Groups & Projects |
COLLABORATIVE PROJECTS
HISTORICAL
SDV Telemetry Project - On Hold |
We use cookies on this site to enhance your user experience. By using this site, you are giving your consent for us to set cookies. |
Planning ongoing for AMM Seoul, October 2017
Repeating the success from AMM Birmingham, May 2017
We will set up a number of GDP related technology demos.
The staff should be attentive and try to greet people that come into the room and propose to them what to go and see, preferrably "guiding" them through a tour. We are considering a fixed time-slot schedule also.
The idea was raised to have booked demo time slots. Schedule will be arranged.
Time | Visiting Individual/Company | Responsible staff |
---|---|---|
xxx-yyy | ||
xxx-yyy |
Demos will likely fall into 3 categories:
For anyone wanting to try the SDE/development experience on their own, a small set of "hands-on" stations might be provided. Staff will give guidance and support depending on availability. .
Key Features and Goals
Feature demo, highlight some principles and goals and relationship to GENIVI as a whole.
Chromium features. Discuss and inform about of flatpak/bwrap.
Smart Device Link
Details to be defined
Software Development Environment (SDE)
What is the SDE environment and what is it like to develop on GDP?
How is the SDE built using pipelines on go.genivi.org?
Should be doable - ironing out a few bugs
Software Over-The-Air Updates
Show the interaction with the SOTA server, and downloading to a target.
Possible but uncertain. Need to prepare this demo again and have someone to demo it.
Navigation / Fuel Stop Advisor
Sent email to Philippe C to check
Car Data Logging
Features listed in email to genivi-projects.
Comtech Navigation Demo
Confirmed.
Company Demo #2
Company Demo #3 ...
To be defined
(also check room layout picture)
Info from Karin:
Grand Ballroom III: 31'x 93'x 19.7' — 9.6m x 28.4m x 6m
Picture / drawing of room:
Our floor layout with tables, etc:
Hardware plans
What | Count | Responsible | Plan Confirmed | Notes |
---|---|---|---|---|
What | 6 | Who | Who | Detailed description. Includes X, Y and Z |
What | Count | Responsible | Plan Confirmed | Notes |
---|---|---|---|---|
Network Switch (100 MBps) | 6 | Nicholas Contino | One per topic station, interconnected | |
Network cables, short | ~25 | " | ||
Network cables, long | 5 | " |
What | Count | Responsible | Plan Confirmed | Notes |
---|---|---|---|---|
Electrical extension to each station (outlet type?) | According to floor plan. | |||
EU and US to XXX Converters? | 10 | |||
Multi-plug extension cords | Can avoid converters on each device (instead plug an extension into a single converter). Because some of the diverse hardware will use US/EU transformers. | |||
Multi-plug extension cords (EU outlets) | same as above | |||
Topic | Needed preparation | Responsible | Plan Confirmed | Notes |
---|---|---|---|---|
Key Features and Goals | Standard GDP-13 or GDP-Master build, (for R-Car Starter kit). The same on Intel (TBC). | |||
Software Over-The-Air Updates | SOTA Demo = Server-setup, account, example package to update, list key presentation points | |||
Software Development Environment (SDE) | SDE Demo. Standard PC + VirtualBox connected to Television. | Gunnar. | ||
Vehicle Signals Demo | Awaiting confirmation that software will be finished. | |||
... continue with all decided demos |
What | Count | Responsible | Confirmed | Notes |
---|---|---|---|---|
Tables | 10 | Provide requirements to Karin | According to layout |
For clarity, strive to down both "GENIVI staff" and each contributing company's staff here for a complete overview.
Day | Opening Hours | Who | Phone | Notes | |
---|---|---|---|---|---|
Tue | xxx - yyy | John Doe #1 | |||
Tue | Jane Doe #2 | ||||
Wed | xxx-yyy | ||||
Wed | |||||